Guidance
   Forms

Investment Environment

Infrastructure facilities:

  1. Electric power
  2. The northwest area and the southwest area of Lingang Industrial Zone are planned to have respectively two-220kv transformer substations. Also, two-110kv transformer substations, several transformer substations of 35kv, and on-off stations of 10kv are to be built in Lingang Industrial Zone.
    There is one-35kv transformer substation in Luchaogang, which is in the east side of Lingang Industrial Zone, and its superior electrical source comes from the 220kv transformer substation in Nanhui District.

  3. Gas
  4. It is planned to use natural gas in Lingang Industrial Zone. In the near future, the natural gas source will come from the East China Sea; while in the far future, the natural gas source will come from the Shanghai natural gas network.
    It is planned to use three classes of pressure system: high pressure (2.5MPa), negative high pressure (0.8MPa), negative medium pressure (0.4MPa), and negative low pressure (0.0038MPa).
    Currently, the natural gas source is connected with the natural gas pipe of 0.4Mpa in Nanlu Road.

  5. Water
  6. In the near future, Huinan Water Plant will supply the water (300,000m3/day); while in the far future, the water will be supplied by the newly built water plant. Relevant water pipes will be laid under the roads in Lingang Industrial Zone.

  7. Rainwater
  8. Rainwater and sewage will be drained away in different drainages. There will be five rainwater pump stations built in the Park. The drainage will be directed in self-drainage and forced drainage.

  9. Sewage
  10. To the Southwest of Lingang Industrial Zone, there will be one sewage disposal plant (designed handling capability is 600,000m3/day, on the first phase, the handling capability will be 100,000m3/day) and a sewage pump station (38.5m3/day).
    Along the Two-port Boulevard, D1 Road and D2 Road, it is planned to build three general sewage pipes. In Lingang Industrial Zone, sewage pipes of 朴300mm-朴600mm will be laid.

  11. Communication
  12. It is planned to build two communication module bureaus in Lingang Industrial Zone (the scale will be 17,000 connections).
    Currently, there is one communication module bureau in Luchaogang farm (the capability of installation is 2000 connections).
    It is planned to lay communication pipes of 12-24 holes under main arteries in Lingang Industrial Zone, and lay communication pipes of 3-9 holes under other roads in Lingang Industrial Zone.

  13. Fire protection
  14. There will be a fire-protection station in Lingang Industrial Zone.

  15. Road
  16. Elevation of road is about 4.2m.
    City express road----Two-port Boulevard (the width of road line is 70m)
    City main artery-----Wanshui Road (D2) and Xinyuan Nan Road (E5)(the width of road line is 50m)
    City secondary artery---- Canghai Road (D1), Jiangshan Road (D3), Changkong Road (D4), Zhengmao Road (D5), Hongyin Road (Y5), Yuyu Road (E6), Miaoxiang Road (E7)(the width of road line is 40m-55m)
    City branch road---- D11 Road, Feizhou Road (D22), Feidu Road (D31), D32 Road, E51 Road, E52 Road, Tiangao Road (E61), E62 Road, Yundan Road (E71), E73 Road, Xunri Road (Y51) (the width of road line is 20m)



Enterprises within Lingang:





Climate Conditions:

Lingang New City is located in the north subtropical zone, and enjoys desirable subtropical monsoon climate. Southeast wind prevails in this area with distinct seasons, abundant sunshine (an annual average sunlight time is 2,109 hours) and rainfall (an annual rainfall of 1,061mm, an annual rainy day is 131 days, relative humidity of 82%), and yearly average temperature is 15.5 centigrade. Non-frost period is about 224 days a year.

Social Facilities:

  • Lingang New City

    Central Living Area: The Central Living Area is built with high-level public service facilities and residential area to support the Yangshan Deep Water Port, Pudong International Airport and the Modern Equipment Industrial Zone.

    The layout of the Central Living Area is ※one lake three loops§. The Dishui Lake, together with its surrounded area is the core of the Central Living Area consisted of lake district, island district, sand beach area with green area.
    The first-ring area is comprehensive business area. The second-ring area is city park and ecological city leisure area. The third-ring area is residential area.

    From 2005 to 2010, the first phase project developing and constructing 22-square-kilometer area will be completed. Area of all the buildings being constructed at the first phase is about 7,300,000m2, and the planning population will be about 145,000.

    Service Center of Lingang Industrial Zone: The Service Center of Lingang Industrial Zone is located at the west of E5 Road, the east of Y5 Road, and the south of Two-port Boulevard. The Center is built suitable for business and life. Office buildings, hotels, apartments, villas, hospitals, convention center, and sporting and leisure places etc. will be built.Customs, Inspection and Quarantine, Tax Bureau, Administration of Industry and Commerce, Public Security Bureau, and banks are completed.

    City communities: Four local ecological city communities, namely, Shuyuan, Wanxiang, Nicheng, Luchaogang, are the important living supplementary to Lingang Industrial Zone.

  • Nanhui District

    Nanhui District is adjacent to Lingang New City, and so many sources in Nanhui District can be shared by Lingang New City.

    Education in Nanhui District: There are 8 high schools with about 60,000 students. Other 68 schools including all kinds of scientific & technical schools, industrial technical schools, middle schools and primary schools. Some of these schools may provide human resources with all kinds of professional skills.
    Shanghai Public Training Base will be the technical training base of modern logistics and modern equipment manufacturing of the whole country. There are British school, International Bilingual School, and well-known kindergarten suitable for international students.

    Labor force: There are over 400,000 labor forces. 100,000 of them have high-school diploma.
    Local professional agents provide employee- recruiting service.

    Hospitals: In Nanhui District, there are Harvard-Huashan International Comprehensive Hospital and Sino-German Amity International Comprehensive Hospital. Nanhui District also has many local hospitals. Total number of local medical treatment institutes is 367 and there are three Grade-two A Level hospitals.

    Guidance for foreign investment:

    1. This regulation is set to guide foreign investors to fit the national economic and social development in China and make investor rights lawful.
    2. This regulation is applied to the project of China 每 foreign joint venture, China 每 foreign corporation and foreign corporation (hereinafter referred to as foreign investment corporation), and other forms of foreign investment project.
    3. ▲Foreign Investment Industrial Guidance List◎ and ▲Central 每 West Area Foreign Investment Advantage Industrial List◎ are constituted by National Development Plan Committee, National Economic Trade Committee, Foreign Commerce Economic Corporation Ministry, and the State Council and publicized after the approval of the State Council. ▲Foreign Investment Industrial Guidance List◎ and ▲Central 每 West Area Foreign Investment Advantage Industrial List◎ are the bases to guide and approve foreign investment project and foreign investment corporation.
    4. The foreign investment project is classified as encouraged industry, permitted industry, limited industry and prohibited industry. The encouraged industry, limited industry and prohibited industry investment project are enlisted into ▲Foreign Investment Industrial Guidance List◎. Those projects out of these three types are permission foreign investment project. Permitted industry foreign investment project is not included in ▲Foreign Investment Industrial Guidance List◎.
    5. Items as below are classified as encouraged industry investment project:
      1. Agriculture new technique, agriculture comprehensive development and resource, traffic, major raw 每 material industry.
      2. High Technique, Advanced Application Technique, New equipment and material, which improve the technique economic efficiency and productivity.
      3. Fulfilling the demand of market, improving product level, developing new market and enhancing product international competition.
      4. New technique, new equipment, and those can save resource and raw material and prevent pollution.
      5. Fulfilling China*s industrial policy and using the advantage of human and resource in the West of China.
      6. Other forms formulated by law.
    6. Items as below are classified as limited industry foreign investment project:
      1. Low technique level
      2. Not good for saving resource and improve ecology environment
      3. Exploring the mineral which prohibited by the law
      4. Progressively developing industry
      5. Other forms formulated by law
    7. Items as below are classified as prohibited industry foreign investment project:
      1. Endangering the national safety and social public.?
      1. Polluting the environment and damaging the natural resource and human*s health
      2. Occupying large cultivated land, harmful for land resource development and protection
      3. Endangering the military equipment safety and using efficacy
      4. Producing by using China*s special technology and technique
      5. Other forms formulated by law
    8. ▲Foreign Investment Industrial Guidance List◎can restrict ※join venture and corporation§ and ※ Chinese side share control or relevant Chinese side share control§.
    9. Except foreign investment project that investors can get preferential condition in encouragement by the law, those who deal with large amount investment, long-term profit resource, traffic, city foundation equipment construction can enlarge their business scope after approval.
    10. Permitted industry foreign investment of product totally direct exporting is regarded to be encouragement foreign investment project. Exporting sales revenue of limitation foreign investment occupying 70% of total sales revenue, it can be regards as permission foreign investment project after approval.
    11. Permitted and limited industry foreign investment project, which can take the advantage of Central 每 West area to develop can be classified to encouragement foreign investment project.
    12. The type of foreign investment project is classified by development and planning department and approved by economic and transaction department.
    13. Approval authorities will cancel the contract and not to give the registration in 30 working days from getting the project proposal file when foreign investment violate the regulation approval. The Customs will not give any treatment process either.
    14. If there is any defrauding to get the project approval, the authority department will cancel the project.

    Guidance on industrial categories in Lingang Park:
    According to the State*s request to SMETDZ and Shanghai*s request to the overall layout of industry, SMETDZ Lingang Park is built up in the core of advanced manufacturing industries and as one of the bases of equipment manufacturing industries of national level.
    The encouraged industrial categories are as below:

    • Electric machine and equipment
    • Transportation equipment and facilities
    • Key special equipment
    • General 每 using machine and parts
    • Electronics and ICT equipment
    • New material and renewable energy equipment
    • Other high 每 technology industry